Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
CS615 Software Project Management assignment no 3 fall semester 23 December 2011
#1

Software Project Management
Assignment # 03
Fall 2011
Marks: 20
Due Date
Your assignment must be uploaded before or on December 27, 2011.

Uploading instructions:

Please view the Assignment Submission Process document provided to you by the Virtual University for uploading assignments.

• Assignment should be in .doc format.
• Save your assignment with your ID (e.g. bx020200786.doc).
• Assignment submission through email is highly discouraged.

Rules for Marking:

It should be clear that your assignment will not get any credit if:
• The assignment is submitted after due date.
• The submitted assignment file is corrupted.
• The assignment is copied.
Note:
Your answer must follow the below given specifications. You will be assigned zero marks if you do not follow these instructions.
• Font style: “Times New Roman”
• Font color: “Black”
• Font size: “12”
• Bold for heading only.
• Font in Italic is not allowed at all.
• No formatting or bullets are allowed to use.

Assignment:




Descon Systems Private Ltd. want to build a Connected Workplace that enables Descon employees to work alone or in small groups at workstations or in informal work areas. Similar to many other organizations, Descon came to the conclusion that their workplace environment was at odds with the way they worked. People were seldom at their desks. Meeting spaces were in short supply. Communication was ever more variable-face-to-face, instant messaging, desktop video, phone, e-mail. And work hours shifted dramatically as the need to work globally increased. The changing workplace is motivated by the organizational issues and facilitated by technologies which are sustained mobility and easy access to information. These pressures and opportunities may not result in a specific new workplace model. A flexible, collaborative workspace could improve productivity and increase employee satisfaction while reducing real estate space and costs by increasing user density from "Descon Connected Workplace that Enhances the Work Experience as well as Cut Costs”. Your main key goals by adopting connected work place are: support collaboration, decrease real estate costs, cut infrastructure costs and accommodate different work style. With these changes in mind, Descon now wants to create the "Connected Workplace." Dear student, you have to identify the workplace solutions and enabling technologies needed for the organizational change.

0300-9520262
Get solution in 24 hour
|cpmputer & internetConfusedmileys81:[SIZE="4"][SIZE="3"]....[/SIZE][/SIZE]
Reply
#2
Solution b mily ga ya bs Question hi???
Reply
#3
dont know
...........
[SIZE="3"]03009520262[/SIZE]
Rabeel Website
Reply
#4
SOLUTION:

People are managed through an organizational structure. This hierarchical structure is based on the four cornerstones of management:

– Delegation

– Authority

– Responsibility

– Supervision.

Delegation bestows authority, and authority produces (and requires) responsibility. Both authority and responsibility require supervision, and effective supervision requires a suitable organizational structure:

Organization as a System

It helps to think of organizations are systems.

Simply put, a system is an organized collection of parts that are highly integrated in order to accomplish an overall goal. (Page 194)

Systems have inputs, processes, outputs and outcomes. To explain, inputs to the system include resources such as raw materials, money, technologies and people data copied from vu solutions. com

These inputs go through a process where they’re aligned, moved along and carefully coordinated, ultimately to achieve the goals set for the system. Outputs are tangible results produced by processes in the system, such as products or services for consumers.

The organization is depicted by its organizational charts, job descriptions, marketing materials, etc.

The organizational system is also maintained or controlled by policies and procedures, budgets, information management systems, quality management systems, performance review systems, etc.

Structural Dimensions

The organization’s structure, or design, is the overall arrangement of the organization’s various roles, processes and their relationships in the organization.

The design of an organization is a means to accomplishing the organization’s overall goal – the structure is not an end in itself.

In systems theory terms, the design ensures that the appropriate inputs go through the necessary (data copied from vu solutions. com) processes to produce the required outputs to produce the intended outcomes.

�� Centralization -the extent to which functions are dispersed in the organization, either in terms of integration with other functions or geographically

�� Formalization - regarding the extent of policies and procedures in the organization

�� Hierarchy - regarding the extent and configuration of levels in the structure

�� Routinization - regarding the extent that organizational processes are standardized

�� Specialization - regarding the extent to which activities are refined

�� Training - regarding the extent of activities to equip organization members with knowledge and skills to carry out their roles.

Traditional Structures of Business Organization (Also see the page number 197 of handouts)

A little description related to the topic just read it:

Description of how new system is to be developed

– Technologies

– In House vs. Consultants

– Derivatives of existing (i.e. use existing object model)

– Architectural Layout – Layers

8. Communications management plan

A communications management plan is a document that provides:

• A collection and filing structure that details what methods will be used to gather and store various types of information. Procedures should also cover collecting and disseminating updates (data copied from vu solutions. com) and corrections to previously distributed material.

• A distribution structure that, details to whom information (status reports, data, schedule, technical documentation, etc.) will flow, and what methods (written reports, meetings, etc.) will be used to distribute various types of information. This structure must be compatible with the responsibilities and reporting relationships described by the project organization chart.

• A description of the information to be distributed, including format, content, level of detail, and conventions/definitions to be used.

• Production schedules showing when each type of communication will be produced.

• Methods for accessing information between scheduled communications.

• A method for updating and refining the communications management plan as the project progresses and develops. The communications management plan may be formal or informal, highly detailed or broadly framed, based on the needs of the project. It is a subsidiary component of the overall project plan.



0300-9520262
Get solution in 24 hour
|cpmputer & internetConfusedmileys81:[SIZE="4"][SIZE="3"]....[/SIZE][/SIZE]
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  CS301 Assignment # 4 Due Date: 02-Feb-2016 Vuhelper 0 2,324 02-03-2016, 05:38 PM
Last Post: Vuhelper
  CS703 – Advanced Operating Systems Assignment No.3 solution January 2016 Vuhelper 0 5,912 01-23-2016, 09:58 PM
Last Post: Vuhelper
  CS601 Data Communication Assignment No. 03 Solution 23rd January 2016 Vuhelper 1 1,931 01-23-2016, 06:09 PM
Last Post: Vuhelper
  CS403 Assignment No. 03 Solution 23rd January 2016 Vuhelper 2 1,169 01-23-2016, 03:18 PM
Last Post: Vuhelper
  CS506 Web Design and Development Assignment no 3 Solution 3rd January 2016 Vuhelper 0 2,249 01-23-2016, 03:16 PM
Last Post: Vuhelper
  CS724 Software Process Improvement Assignment No 01 Solution 20th January 2016 Vuhelper 0 1,972 01-20-2016, 06:26 PM
Last Post: Vuhelper
  CS711 Software Design Assignment No 01 Solution Due Date Feb 12, 2016 Vuhelper 0 1,671 01-20-2016, 06:24 PM
Last Post: Vuhelper
  CS709 Formal Methods for Software Engineering Assignment No 01 Solution January 2016 Vuhelper 0 1,808 01-20-2016, 06:22 PM
Last Post: Vuhelper
  cs703 assignment no 3 Solution 20th January 2016 Vuhelper 0 1,702 01-20-2016, 06:20 PM
Last Post: Vuhelper
  CS704 Assignment No. 01 Solution January 2016 Vuhelper 0 4,800 01-20-2016, 06:19 PM
Last Post: Vuhelper

Forum Jump:


Users browsing this thread: 1 Guest(s)