07-24-2010, 05:53 AM
Question 1
615.JPG (Size: 11.75 KB / Downloads: 82)
MNRTU is not representing the critical path.
Correct path is here.
L+N+O+R+T+U=3+2+5+3+2+0=15
The critical path is the longest path through the system, The critical path in this project is L+N+O+R+T+U determining that the project can be completed in15 (less than the 25 total of resource-usage time).
615.JPG (Size: 11.75 KB / Downloads: 82)
MNRTU is not representing the critical path.
Correct path is here.
L+N+O+R+T+U=3+2+5+3+2+0=15
The critical path is the longest path through the system, The critical path in this project is L+N+O+R+T+U determining that the project can be completed in15 (less than the 25 total of resource-usage time).